Client: Berkeley Group
Architect: Various
Location: Woolwich, London
Sol Acoustics have assisted Berkeley Group with the design and construction of the Royal Arsenal Riverside Development (all phases to date), including Phase 2, Phase 3, Phase 4 OSD A/B/C/D/E, Phases 6 – 11, Building 10 and 11, NW Range (Listed buildings), OSD East, and the RAR Energy Centre (both iterations).
As part of the Royal Arsenal Riverside Development, Sol has extensive project design experience assessing the acoustic impact on residential apartments, including groundborne noise and vibration, from the subterranean CrossRail project and other major strategic infrastructure sources including road, rail and air.